This report was a mechanical systems assessment for the Coop Gas Station in Kamsack. The building consisted of a sales floor, kitchen, office space, staff room, washroom, and storage.
Cilent:
P3 Architecture Partnership
Design Team:
P3 Architecture Partnership (Architectural, Prime)
R. J. England Consulting Ltd. (Mechanical)
BBK Engineering (Structural)
ALFA Engineering Ltd. (Electrical)
Completion Date:
2023