This report was a mechanical systems assessment for the Coop Gas Station in Yorkton. The building consisted of a sales floor, office space, washroom, storage, and car wash.
Cilent: P3 Architecture Partnership
Design Team:

P3 Architecture Partnership (Architectural, Prime)
R. J. England Consulting Ltd. (Mechanical)
BBK Engineering (Structural)
ALFA Engineering Ltd. (Electrical)

Completion Date: 2023
Coop Yorkton Gas Station