This report outlines the mechanical systems present in the facility and provides commentary on their suitability for future use. On site observations affecting the equipment condition and an opinion of probable costs to update the equipment are provided.
Cilent:
Alton Tangedal Architect Ltd.
Design Team:
Alton Tangedal Architect (Architectural, Prime)
BBK Engineering (Structural)
R. J. England Consulting (Mechanical)
ALFA Engineering (Electrical)
Completion Date:
2024