Regina, Saskatchewan
R. J. England Consulting Ltd. acted as the Prime Consultant for replacing the tubes in one of the original (ca. 1970) 25,000,000 btu/hr fire-tube boilers.
Building:
Saskatchewan Polytechnic Regina Campus
Project:
Boiler Re-tubing
Cilent:
Province of Saskatchewan
Design Team:
R. J. England Consulting Ltd (Mechanical, Prime)
Contractor(s):
Walter’s Industrial Mechanical (General)
ACME Welding (Mechanical)
Completion Date:
2022