Regina, Saskatchewan

R. J. England Consulting Ltd. acted as prime consultants to McCor Management Inc. for the replacement of the north tower’s 60 ton chiller. The work included lifting the existing chiller off the north tower and lifting the new chiller in its place. The new chiller was tied back into the north towers cooling system.

Building: South Broad Plaza
Project: South Broad Plaza South Tower Chiller Replacement
Cilent: McCor Management Inc.
Design Team:

R. J. England Consulting Ltd (Prime, Mechanical)
JCK Engineering (Structural)

Contractor(s):

Walter’s Industrial Mechanical (Mechanical)

Completion Date: 2024